Projects
Green Bridge
PROJECT REVIEWS
Remedials to Relieving Slab

Project Type
Slab jacking & stabilization of bridge relieving slab

Client
BCC

Scope of Work
Determine the layout of the reinforcement and voids with GPR,
prepare slab with injection point,set up injection pump system,
use a cementitious grout system previously used to fill voids and stabilize
prepare slab with injection point,set up injection pump system,
use a cementitious grout system previously used to fill voids and stabilize

Project Program
Night time over 3 days

Key Performance Indicators
Ensure that the bridge would be open for busses in
the morning and capable of carrying the imposed loadings
the morning and capable of carrying the imposed loadings

Innovation
The injection technique

Date
2014

Pricing Range
0 – $50 K